Additional Fees & Charges

Electricity

Additional Fees and Charges – Electricity

Cost (incl GST)

Connection Fee – Move In:

Next Day Move In
‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day.

 

Priority Move In
“Priority” connection applies if request is received between 10am and 2pm for connection on the same business day

 

Emergency Move In Connection
“Emergency” connection applies if request is received between 2pm and 5pm for connection on the same business day up to 9.30pm. (excl pub hols & weekends)

 

$66.00 (from 13 Sept, 2024)

 

$97.90 (from 13 Sept, 2024)

 

$174.90 (from 13 Sept, 2024)

Disconnection Fee – Move Out:

Next Day Move Out
‘Next Day” disconnection applies if request is received by 5pm day before for disconnection on the next business day.

 

$66.00 (from 13 Sept, 2024)

Special Meter Read Fee (field visit) – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

 

Bulk Special Meter Read >50 Meter – $/meter – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

$38.50 (will change to $39.89 from 1 July 2024)

 

$16.50 (will change to $39.89 from 1 July 2024)

Service Technician Fees:

Service Technician Visit Fee – By appointment. Applies to requests such as shutdowns, abolishment’s, after hours works, CT meter isolations, etc.

 

Wasted Field Visit Fee – Business hours only. NEXT DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Field Visit Fee –Business hours only. SAME DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

 

Wasted Service Technician Fee – Business hours only. NEXT DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

 

 

Wasted Service Technician Fee – Business hours only. SAME DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

Quoted

 

$38.50 (will change to $78.65 from 1 July 2024)

 

$38.50 (will change to $102.58 from 1 July 2024)

 

$198.00 (will change to $78.65 from 1 July 2024)

 

$198.00 (will change to $102.58 from 1 July 2024)

 

Reconnection Fee after disconnection for non-payment

‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day (fee is for disc and reconn all in one).

$198.00 (will change to $157.30 from 1 July 2024)
Meter Investigation

Business hours only. Next Day. Customer initiated request for special investigation, e.g. interval data analysis, wiring transposition.

$176.00 (will change to $213.15 from 1 July 2024)
Meter Testing 

See local Distributor’s website for charges.

Quoted (will change to $213.15 from 1 July 2024)
Bill Postage & Historical Billing information:

Postage & Handling Fee for Invoices Sent by Post – $/invoice posted via mail services.

Historical Billing Information or Meter Data – Fee only applies if information requested > 2 years old or has been requested more than 4 times in any 12 month period.

$0.00

 

$0.00

Payment Dishonor Fee

Cheque Any fees incurred for dishonored.

Direct debit (bank account) Will be applied to the next bill.

Direct Debit (credit card) No fee.

 

Pass through

$2.75

$0.00

Off Supply Charges for National Response Center to Apply

After 5pm Monday – Thursday ex pub hol and before 10.00am on next business day – timeframe agreed with customer

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am and 2.30pm on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 2.30pm and 5.00pm on same business day.

 

 

After 5pm Friday or on a public hol or weekend and before 10.00am on next business day – timeframe agreed with customer

 

$78.65 (from 1 July 2024)

 

$102.58(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$512.92(from 1 July 2024)

New or Upgraded Metering Charge
Meter Reconfiguration Charge

Applies due to the installation of a solar meter or when meter reprogramming is required

$71.50
1PH interval mtr Quoted
3PH interval mtr Quoted
3PH CT interval mtr Quoted
New Connection Fees  Jemena  United  Energy  Citipower Powercor Ausnet Services 
Single Phase (ToU) $655.60 $520.30 $555.50 $557.70 $233.20
Three Phase (ToU) $850.03 $520.30 $664.40 $689.70 $349.80
Three Phase CT (ToU) Quoted Quoted $2,780.80 $2,703.80 $503.80

A new connection fee may be charged for establishing the connection between the community energy network and your tenancy. If you are not the owner of the property, this fee is recoverable from your landlord under the Residential Tenancies Act 1997 (Section 53): Residential Tenancies Act 1997 (Section 53) (view online) Landlord’s liability for various utility charges 53. Landlord’s liability for various utility charges(1) A landlord is liable for-(a) the installation costs and charges in respect of the initial  connection to  rented premises of any electricity, water, gas, bottled gas or oil supply service.

Additional Fees and Charges – Electricity

Cost (Incl GST)

Connection Fee – Move In

Next Day Move In
‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day.

 

Priority Move In
“Priority” connection applies if request is received between 10am and 2pm for connection on the same business day

 

Emergency Connection
“Emergency” connection applies if request is received between 2pm and 5pm for connection on the same business day up to 9.30pm. (excl pub hols & weekends)

               $66.00 (from 13 Sept 2024)

 

$97.90 (from 13 Sept 2024)

 

$174.90 (from 13 Sept 2024)

Disconnection Fee – Move Out

Next Day Move Out
‘Next Day” disconnection applies if request is received by 5pm day before for disconnection on the next business day.

 

$66.00(from 13 Sept 2024)

 

Special Meter Read Fee (field visit) – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

 

Bulk Special Meter Read >$/meter – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

$0.00 (will change to $39.89 from 1 July 2024)

 

$11.61 (will change to $39.89 from 1 July 2024)

Service Technician Fees

Service Technician Visit Fee – By appointment. Applies to requests such as shutdowns, abolishment’s, after hours works, CT meter isolations, etc.

 

Wasted Field Visit Fee – Business hours only. NEXT DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Field Visit Fee – Business hours only. SAME DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

 

Wasted Service Technician Fee –  Business hours only. NEXT DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

 

 

 

Wasted Service Technician Fee –  Business hours only. SAME DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

Quoted

 

$40.02 (will change to $78.65 from 1 July 2024)

 

$40.02 (will change to $102.58 from 1 July 2024)

 

$50.15 (will change to $78.65 from 1 July 2024)

 

$50.15 (will change to $102.58 from 1 July 2024)

Reconnection Fee after disconnection for non-payment – ‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day. (fee is for disc and reconn all in one) $141.22 (will change to $157.30 from 1 July 2024)
Meter Investigation 

Business hours only. Next Day. Customer initiated request for special investigation, e.g. interval data analysis, wiring transposition.

 

Meter Testing 

See local Distributor’s website for charges.

Quoted (will change to $213.15 from 1 July 2024)

 

Quoted (will change to $213.15 from 1 July 2024)

Payment Dishonour Fee

Cheque Any fees incurred for dishonoured.

 

Direct debit (bank account) Will be applied to the next bill.

Direct Debit (credit card) No fee.

Pass through

 

$2.75

 

$0.00

Historical Billing Information or Meter Data

Fee only applies if information requested > 2 years old or has been requested more than 4 times in any 12 month period.

$0.00
Off Supply Charges for National Response Center to Apply

After 5pm Monday – Thursday ex pub hol and before 10.00am on next business day – timeframe agreed with customer

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am on same business day.

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am and 2.30pm on same business day.

 

“Priority” same day site attendance by 5.30pm if request is received by 2.30pm and 5.00pm on same business day.

 

After 5pm Friday or on a public hol or weekend and before 10.00am on next business day – timeframe agreed with customer

$78.65 (from 1 July 2024)

 

$102.58(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$512.92(from 1 July 2024)

New or Upgraded Metering Charge
Meter Reconfiguration Charge

Applies due to the installation of a solar meter or when meter reprogramming is required.

$71.50
1PH interval mtr Quoted
3PH interval mtr Quoted
3PH CT interval mtr Quoted

Additional Fees and Charges – Electricity

Cost (Incl GST)

Connection Fee – Move In

Next Day Move In
‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day

 

Priority Move In
“Priority” connection applies if request is received between 10am and 2pm for connection on the same business day

 

Emergency Connection

“Emergency” connection applies if request is received after 2pm for connection on the same day.

$66.00 (from 13 Sept 2024)

 

$97.90 (from 13 Sept 2024)

 

$174.90 (from 13 Sept 2024)

Disconnection Fee

Next Day Move Out
‘Next Day” disconnection applies if request is received by 5pm day before for disconnection on the next business day.

 

$66.00 (from 13 Sept 2024)

 

Special Meter Read Fee (field visit) – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

 

Bulk Special Meter Read >$/meter – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

$8.76 (will change to $39.89 from 1 July 2024)

 

$11.61 (will change to $39.89 from 1 July 2024)

Service Technician Fees

Service Technician Visit Fees – By appointment. Applies to requests such as shutdowns, abolishment’s, after hours works, CT meter isolations, etc.

 

Wasted Field Visit Fee – Business hours only. NEXT DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Field Visit Fee – Business hours only. SAME DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

 

Wasted Service Technician Fee – Business hours only. NEXT DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

 

 

 

Wasted Service Technician Fee – Business hours only. SAME DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

Quoted

 

$8.76 (will change to $78.65 from 1 July 2024)

 

$8.76 (will change to $102.58 from 1 July 2024)

 

$134.75(will change to $78.65 from 1 July 2024)

 

$134.75(will change to $102.58 from 1 July 2024)

Reconnection Fee after disconnection for non-payment

‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day (fee is for disc and reconn all in one).

$50.05 (will change to $157.30 from 1 July 2024)
Meter Investigation

Business hours only. Next Day. Customer initiated request for special investigation, e.g. interval data analysis, wiring transposition.

Quoted(will change to $213.15 from 1 July 2024)
Meter Testing 

See local Distributor’s website for charges.

Quoted (will change to $213.15 from 1 July 2024)
Bill Postage & Historical Billing information:

Postage & Handling Fee for Invoices Sent by Post – $/invoice posted via mail services.

 

Historical Billing Information or Meter Data – Fee only applies if information requested > 2 years old or has been requested more than 4 times in any 12 month period.

$2.20

 

$0.00

Payment Dishonor Fee

Cheque Any fees incurred for dishonored.

 

Direct debit (bank account) Will be applied to the next bill.

 

Direct Debit (credit card) No fee.

 

Pass through

 

$2.75

 

$0.00

Off Supply Charges for National Response Center to ApplyAfter 5pm Monday – Thursday ex pub hol and before 10.00am on next business day – timeframe agreed with customer

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am on same business day.

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am and 2.30pm on same business day.

 

“Priority” same day site attendance by 5.30pm if request is received by 2.30pm and 5.00pm on same business day.

 

After 5pm Friday or on a public hol or weekend and before 10.00am on next business day – timeframe agreed with customer

$78.65 (from 1 July 2024)

 

$102.58(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$512.92(from 1 July 2024)

New or Upgraded Metering Charge
Meter Reconfiguration Charge

Applies due to the installation of a solar meter or when meter reprogramming is required.

$71.50
1PH interval mtr Quoted
3PH interval mtr Quoted
3PH CT interval mtr Quoted

Additional Fees and Charges – Electricity

Cost (Incl GST)

Connection Fee

Next Day Move In
‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day.

 

Priority Move In
“Priority” connection applies if request is received between 10am and 2pm for connection on the same business day

 

Emergency Connection
“Emergency” connection applies if request is received between 2pm and 5pm for connection on the same business day up to 9.30pm. (excl pub hols & weekends)

$66.00 (from 13 Sept 2024)

 

$97.90 (from 13 Sept 2024)

 

$174.90 (from 13 Sept 2024)

Disconnection Fee – Move Out

Next Day Move Out
‘Next Day” disconnection applies if request is received by 5pm day before for disconnection on the next business day.

 

$66.00 (from 13 Sept 2024)
Special Meter Read Fee (field visit) – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

 

 

Bulk Special Meter Read > $/meter – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

$15.07(will change to $39.89 from 1 July 2024)

 

$15.07(will change to $39.89 from 1 July 2024)

Service Technician Fees

Service Technician Visit Fee – By appointment. Applies to requests such as shutdowns, abolishment’s, after hours works, CT meter isolations, etc.

 

 

Wasted Field Visit Fee – Business hours only. NEXT DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Field Visit Fee – Business hours only. SAME DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Service Technician Fee –  Business hours only. NEXT DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

 

 

Wasted Service Technician Fee –  Business hours only. SAME DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

Quoted

 

$40.48(will change to $78.65 from 1 July 2024)

 

$40.48(will change to $102.58 from 1 July 2024)

 

$181.50 (will change to $78.65 from 1 July 2024)

 

$181.50(will change to $102.58 from 1 July 2024)

Reconnection Fee after disconnection for non-payment (fee is for disc and reconn all in one)

‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day (fee is for disc and reconn all in one)

$80.96(will change to $157.30 from 1 July 2024)
Meter Investigation

Business hours only. Next Day. Customer initiated request for special investigation, e.g. interval data analysis, wiring transposition.

Quoted (will change to $213.15 from 1 July 2024)
Meter Testing 

See local Distributor’s website for charges.

Quoted(will change to $213.15 from 1 July 2024)
Bill Postage & Historical Billing information:

Postage & Handling Fee for Invoices Sent by Post – $/invoice posted via mail services.

 

Historical Billing Information or Meter Data – Fee only applies if information requested > 2 years old or has been requested more than 4 times in any 12 month period.

$2.20

 

$0.00

Payment Dishonor Fee

Cheque Any fees incurred for dishonored.

 

Direct debit (bank account) Will be applied to the next bill.

 

Direct Debit (credit card) No fee.

 

Pass through

 

$2.75

 

$0.00

Off Supply Charges for National Response Center to ApplyAfter 5pm Monday – Thursday ex pub hol and before 10.00am on next business day – timeframe agreed with customer

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am and 2.30pm on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 2.30pm and 5.00pm on same business day.

 

 

After 5pm Friday or on a public hol or weekend and before 10.00am on next business day – timeframe agreed with customer

$78.65 (from 1 July 2024)

 

$102.58(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$512.92(from 1 July 2024)

New or Upgraded Metering Charge
Meter Reconfiguration Charge

Applies due to the installation of a solar meter or when meter reprogramming is required.

$71.50
1PH interval mtr $220.66
3PH interval mtr $543.40
3PH CT interval mtr Quoted

Additional Fees and Charges – Electricity

Cost (Incl GST) 

Connection Fee

Next Day Move In
‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day.

 

 

Priority Move In
“Priority” connection applies if request is received between 10am and 2pm for connection on the same business day

 

 

Emergency Connection

“Emergency” connection applies if request is received after 2pm for connection on the same day.

 

$66.00 (from 13 Sept 2024)

 

 

$97.90 (from 13 Sept 2024)

 

 

 

$174.90 (from 13 Sept 2024)

Disconnection Fee – Move Out

Next Day Move Out
‘Next Day” disconnection applies if request is received by 5pm day before for disconnection on the next business day.

 

Same Day  Move Out
“Same Day” disconnection applies if request is received by 10am for disconnection on same business day

 

Priority Move Out
“Priority” disconnection applies if request is received between 10am and 2pm for disconnection on the same business day

$66.00 (from 13 Sept 2024)

 

$66.00 (from 13 Sept 2024)

 

$97.90 (from 13 Sept 2024)

Special Meter Read Fee (Field Visit) – ‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

 

Bulk Special meter read > $/meter -‘Next Day” field visit applies if request is received by 5pm day before for next business day. Type 5 & 6 meter.

 

$16.63 (will change to $39.89 from 1 July 2024)

 

$0.00 (will change to $39.89 from 1 July 2024)

Service Technician Fees:

Service Technician Visit Fees – By appointment.  Applies to requests such as shutdowns, abolishment’s, after hours works, CT meter isolations, etc.

 

Wasted Field Visit Fee – Business hours only. NEXT DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Field Visit Fee – Business hours only. SAME DAY E.g. customer fails to provide access as arranged for special meter read, reconnection or disconnection request.

 

 

Wasted Service Technician Fee – Business hours only. NEXT DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

 

 

Wasted Service Technician Fee – Business hours only. SAME DAY. Applies when a service technician booking is wasted and not due to any fault of WINconnect.  E.g. fault attendance found consumer’s main switch was off.

Quoted

 

$38.50 (will change to $78.65 from 1 July 2024)

 

$38.50 (will change to $102.58 from 1 July 2024)

 

$198.00 (will change to $78.65 from 1 July 2024)

 

$198.00 (will change to $102.58 from 1 July 2024)

Historical Billing Information or Meter Data

Fee only applies if information requested is > 2 years old or has been requested more than 4 times in any 12 month period.

$0.00
Meter Investigation

Business hours only. Next Day. Customer initiated request for special investigation, e.g. interval data analysis, wiring transposition.

Quoted (will change to $213.15 from 1 July 2024)
Meter Testing 

See local Distributor’s website for charges.

$305.59(will change to $305.00 from 1 July 2024)
Meter Reconfiguration Charge

Applies due to the installation of a solar meter or when meter reprogramming is required.

$71.50
Off Supply Charges for National Response Center to ApplyAfter 5pm Monday – Thursday ex pub hol and before 10.00am on next business day – timeframe agreed with customer

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 10.30am and 2.30pm on same business day.

 

 

“Priority” same day site attendance by 5.30pm if request is received by 2.30pm and 5.00pm on same business day.

 

 

After 5pm Friday or on a public hol or weekend and before 10.00am on next business day – timeframe agreed with customer

$78.65 (from 1 July 2024)

 

$102.58(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$313.45(from 1 July 2024)

 

$512.92(from 1 July 2024)

Reconnection Fee after disconnection for non-payment ‘Next Day” connection applies if request is received by 5pm day before for connection on the next business day. (fee is for disc and reconn all in one) $160.00(will change to $157.30 from 1 July 2024)
New or Upgraded Metering Charge 

 

1PH interval meter 

3PH interval meter

3PH CT interval meter 

 

$0.00

$0.00

$0.00

Hot Water

Additional Fees and Charges – Hot Water

Cost 

Standard Hot Water Connection Fee

Standard Hot Water Connection Fee applies when a ‘Get Connected’ request is received by 2pm on a business day and a start read/connection is carried out the next business day or thereafter.

$0.00
Standard Hot Water Move-Out Fee

Standard Hot Water Move-Out Fee applies when a ‘Moving Out’ request is received by 2pm on a business day and a final read/disconnection is carried out the next business day or thereafter.

$0.00
Priority Hot Water Connection Fee / Priority Hot Water Move Out Fee

(This service may not be available in all areas) 

Priority Hot Water Connection Fee applies for same day connection when a ‘Priority Get Connected’ request is received before 2pm on a business day and a start read/connection is carried out that day, or the following business day if received after 2pm.

Priority Hot Water Move Out Fee applies when a ‘Priority Moving Out’ request is received before 2pm on a business day and a final read/disconnection is carried out that day, or the following business day if received after 2pm.

 

 

$88.00

 

 

Emergency Hot Water Connection Fee/ Emergency Hot Water Move Out Fee

(This service may not be available in all areas)

Emergency Hot Water Connection Fee applies for same day connection when a ‘Emergency Get Connected’ request is received after 2pm on a business day and a start read/connection is carried out on that day.

Emergency Hot Water Move Out Fee applies when a ‘Emergency Moving Out’ request is received after  2pm on a business day and a final read/disconnection is carried out that day.

$264.00
Reconnection Fee

Reconnection after customer was disconnected for example for non-payment (fee for disconnection and reconnection all in one).

$198.00
Paper Bill Fee

A fee for receiving a bill in the mail.

$0.00
Meter investigation (if no fault detected)

A fee for when a customer has initiated request for special meter investigation, e.g. internal data analysis, wiring transposition, and the investigation is provided during business hours.

$193.60
Meter testing (if no fault detected)

As quoted

As quoted
Installation of a new or upgraded meter

As quoted

As quoted
Meter reconfiguration charge

Applies due to installation of a solar meter or when meter programming is required

As quoted
Card payment fee

A fee for paying by Mastercard, Visa or another payment method where we incur a merchant services fee, which will be applied to the next bill

$0.00

Additional Fees and Charges – Hot Water

Cost 

Standard Hot Water Connection Fee

Standard Hot Water Connection Fee applies when a ‘Get Connected’ request is received by 2pm on a business day and a start read/connection is carried out the next business day or thereafter.

$0.00
Standard Hot Water Move-Out Fee

Standard Hot Water Move-Out Fee applies when a ‘Moving Out’ request is received by 2pm on a business day and a final read/disconnection is carried out the next business day or thereafter.

$0.00
Priority Hot Water Connection Fee / Priority Hot Water Move Out Fee

(This service may not be available in all areas) 

Priority Hot Water Connection Fee applies for same day connection when a ‘Priority Get Connected’ request is received before 2pm on a business day and a start read/connection is carried out that day, or the following business day if received after 2pm.

Priority Hot Water Move Out Fee applies when a ‘Priority Moving Out’ request is received before 2pm on a business day and a final read/disconnection is carried out that day, or the following business day if received after 2pm.

 

 

$106.70

 

 

Emergency Hot Water Connection Fee/ Emergency Hot Water Move Out Fee

(This service may not be available in all areas)

Emergency Hot Water Connection Fee applies for same day connection when a ‘Emergency Get Connected’ request is received after 2pm on a business day and a start read/connection is carried out on that day.

Emergency Hot Water Move Out Fee applies when a ‘Emergency Moving Out’ request is received after 2pm on a business day and a final read/disconnection is carried out that day.

$308.00
Reconnection Fee

Reconnection after customer was disconnected for example for non-payment (fee for disconnection and reconnection all in one).

$184.69
Paper Bill Fee

A fee for receiving a bill in the mail.

$0.00
Meter investigation (if no fault detected)

A fee for when a customer has initiated request for special meter investigation, e.g. internal data analysis, wiring transposition, and the investigation is provided during business hours.

$193.60
Meter testing (if no fault detected)

As quoted

As quoted
Installation of a new or upgraded meter

As quoted

As quoted
Meter reconfiguration charge

Applies due to installation of a solar meter or when meter programming is required

As quoted
Card payment fee

A fee for paying by Mastercard, Visa or another payment method where we incur a merchant services fee, which will be applied to the next bill

$0.00

Additional Fees and Charges – Hot Water

Cost 

Standard Hot Water Connection Fee

Standard Hot Water Connection Fee applies when a ‘Get Connected’ request is received by 2pm on a business day and a start read/connection is carried out the next business day or thereafter.

$0.00
Standard Hot Water Move-Out Fee

Standard Hot Water Move-Out Fee applies when a ‘Moving Out’ request is received by 2pm on a business day and a final read/disconnection is carried out the next business day or thereafter.

$0.00
Priority Hot Water Connection Fee / Priority Hot Water Move Out Fee

(This service may not be available in all areas) 

Priority Hot Water Connection Fee applies for same day connection when a ‘Priority Get Connected’ request is received before 2pm on a business day and a start read/connection is carried out that day, or the following business day if received after 2pm.

Priority Hot Water Move Out Fee applies when a ‘Priority Moving Out’ request is received before 2pm on a business day and a final read/disconnection is carried out that day, or the following business day if received after 2pm.

 

 

$106.70

 

 

Emergency Hot Water Connection Fee/ Emergency Hot Water Move Out Fee

(This service may not be available in all areas)

Emergency Hot Water Connection Fee applies for same day connection when a ‘Emergency Get Connected’ request is received after 2pm on a business day and a start read/connection is carried out on that day.

Emergency Hot Water Move Out Fee applies when a ‘Emergency Moving Out’ request is received after 2pm on a business day and a final read/disconnection is carried out that day.

$120.89
Reconnection Fee

Reconnection after customer was disconnected for example for non-payment (fee for disconnection and reconnection all in one).

$50.05
Paper Bill Fee

A fee for receiving a bill in the mail.

$2.20
Meter investigation (if no fault detected)

A fee for when a customer has initiated request for special meter investigation, e.g. internal data analysis, wiring transposition, and the investigation is provided during business hours.

$193.60
Meter testing (if no fault detected)

As quoted

As quoted
Installation of a new or upgraded meter

As quoted

As quoted
Meter reconfiguration charge

Applies due to installation of a solar meter or when meter programming is required

As quoted
Card payment fee

A fee for paying by Mastercard, Visa or another payment method where we incur a merchant services fee, which will be applied to the next bill

$0.00

Additional Fees and Charges – Hot Water

Cost 

Standard Hot Water Connection Fee

Standard Hot Water Connection Fee applies when a ‘Get Connected’ request is received by 2pm on a business day and a start read/connection is carried out the next business day or thereafter.

$0.00
Standard Hot Water Move-Out Fee

Standard Hot Water Move-Out Fee applies when a ‘Moving Out’ request is received by 2pm on a business day and a final read/disconnection is carried out the next business day or thereafter.

$0.00
Priority Hot Water Connection Fee / Priority Hot Water Move Out Fee

(This service may not be available in all areas) 

Priority Hot Water Connection Fee applies for same day connection when a ‘Priority Get Connected’ request is received before 2pm on a business day and a start read/connection is carried out that day, or the following business day if received after 2pm.

Priority Hot Water Move Out Fee applies when a ‘Priority Moving Out’ request is received before 2pm on a business day and a final read/disconnection is carried out that day, or the following business day if received after 2pm.

 

 

$95.81

 

 

Emergency Hot Water Connection Fee/ Emergency Hot Water Move Out Fee

(This service may not be available in all areas)

Emergency Hot Water Connection Fee applies for same day connection when a ‘Emergency Get Connected’ request is received after 2pm on a business day and a start read/connection is carried out on that day.

Emergency Hot Water Move Out Fee applies when a ‘Emergency Moving Out’ request is received after 2pm on a business day and a final read/disconnection is carried out that day.

$95.81
Reconnection Fee

Reconnection after customer was disconnected for example for non-payment (fee for disconnection and reconnection all in one).

$80.96
Paper Bill Fee

A fee for receiving a bill in the mail.

$2.20
Meter investigation (if no fault detected)

A fee for when a customer has initiated request for special meter investigation, e.g. internal data analysis, wiring transposition, and the investigation is provided during business hours.

$193.60
Meter testing (if no fault detected)

As quoted

As quoted
Installation of a new or upgraded meter

As quoted

As quoted
Meter reconfiguration charge

Applies due to installation of a solar meter or when meter programming is required

As quoted
Card payment fee

A fee for paying by Mastercard, Visa or another payment method where we incur a merchant services fee, which will be applied to the next bill

$0.00

Additional Fees and Charges – Hot Water

Cost 

Standard Hot Water Connection Fee

Standard Hot Water Connection Fee applies when a ‘Get Connected’ request is received by 2pm on a business day and a start read/connection is carried out the next business day or thereafter.

$0.00
Standard Hot Water Move-Out Fee

Standard Hot Water Move-Out Fee applies when a ‘Moving Out’ request is received by 2pm on a business day and a final read/disconnection is carried out the next business day or thereafter.

$0.00
Priority Hot Water Connection Fee / Priority Hot Water Move Out Fee

(This service may not be available in all areas) 

Priority Hot Water Connection Fee applies for same day connection when a ‘Priority Get Connected’ request is received before 2pm on a business day and a start read/connection is carried out that day, or the following business day if received after 2pm.

Priority Hot Water Move Out Fee applies when a ‘Priority Moving Out’ request is received before 2pm on a business day and a final read/disconnection is carried out that day, or the following business day if received after 2pm.

 

 

$97.00

 

 

Emergency Hot Water Connection Fee/ Emergency Hot Water Move Out Fee

(This service may not be available in all areas)

Emergency Hot Water Connection Fee applies for same day connection when a ‘Emergency Get Connected’ request is received after 2pm on a business day and a start read/connection is carried out on that day.

Emergency Hot Water Move Out Fee applies when a ‘Emergency Moving Out’ request is received after 2pm on a business day and a final read/disconnection is carried out that day.

$280.00
Reconnection Fee

Reconnection after customer was disconnected for example for non-payment (fee for disconnection and reconnection all in one).

$160.00
Paper Bill Fee

A fee for receiving a bill in the mail.

$1.20
Meter investigation (if no fault detected)

A fee for when a customer has initiated request for special meter investigation, e.g. internal data analysis, wiring transposition, and the investigation is provided during business hours.

$193.60
Meter testing (if no fault detected)

As quoted

As quoted
Installation of a new or upgraded meter

As quoted

As quoted
Meter reconfiguration charge

Applies due to installation of a solar meter or when meter programming is required

As quoted
Card payment fee

A fee for paying by Mastercard, Visa or another payment method where we incur a merchant services fee, which will be applied to the next bill

$0.00

All amounts Inc. GST, where applicable.